When: 15:15, 19th of January, 2023
Where: Hörsal 7 (SB-H7), groundfloor, ACE, building SB2 (Sven Hultins gata 6)
The aftermingle will take place outside Hörsal 7, no registration is necessary.
The promotion lecture will be held in Swedish.
Want to watch it via Zoom?
Join from PC, Mac, Linux, iOS or Android: https://chalmers.zoom.us/j/61070401644
Password: BRO
Construction-integrated bridge and structural engineering
The design determines how a civil structure, e.g a bridge, should be built to meet all the requirements set by the customer; function, aesthetics, robustness and cost as well as society’s requirements for safety, load-bearing capacity and durability. In the design phase, it is sometimes forgotten how the structure is to be built, and how this can be done in rational a safe way. Today, too many non-buildable solutions are developed by designers who have no interaction with production and have lack of knowledge on limitations and possibilities in production.
There is great potential for savings in society if you can avoid/minimize time losses and futile costs as a result of redesign in the execution phase due to non-production-adapted solutions. It is a matter of gaining experience from production at an early stage in the planning of the design. With today’s tools and better use of digital development, models and parameterization can be used to enable optimization with more requirements, choices, and parameters such as quantities, cost, time, CO2 equivalents, buildability and safety.